Open House Festival

Church Street Triangle

community/cultural

Jan Kattein Architects, 2024

Church St, NW8 8ET

The Church Street Triangle in Westminster marks a divide between the affluent antiques quarter to the North and the local market to the South. A disused mock-Tudor toilet block, a row of vacant shops and windswept square are refurbished and transformed into a café, work and community space, stitching together a disparate family of civic spaces for greater social and physical coherence.

Getting there

Tube

Edgware Road Bakerloo, Edgware Road Circle, Marylebone, Paddington

Train

Marylebone, Paddington

Bus

16, 139, 189, 98

Access

Facilities

Create a free visitor account to book festival tickets

Drop in activities

Sat 13 Sep

11:00–16:00

Drop in: Open day

12:00–13:00

Drop in: Guided Tour

13:00–14:00

Drop in: Guided Tour

14:00–15:00

Drop in: Guided Tour

15:00–16:00

Drop in: Guided Tour

About

Project description

Church Street is a historic market street in Westminster, straddling one of the borough’s most deprived wards. The Triangle demarcates a strategic and economic divide between the more affluent antiques quarter in the north-east and the local market occupying the south-west. At street level, the weekday market has struggled to diversify its offer, while accessibility was limited by the closure of the half-timbered public toilet.

In 2018, Westminster City Council appointed JKA to work with local people to develop ideas that would bridge the divide. Through open workshops and public events, we shaped a strategy to bring vacant shops back into productive use, repair building frontages, re-open a public toilet. Outside, a traffic lane has been removed to reconnect the public toilet and café into the Triangle and the market to an expanded public realm. Meandering gabions, filled with old roof tiles from the toilet roof and York stone salvaged from nearby repaving, provide sociable but informal seating arrangement to support food stalls while also welcoming residents. Backrests in folded metal ensure that users of varying mobility can comfortably spend time in the Triangle.

The project received funding from the Mayor of London in 2019 and works were completed on site in 2023.

Online presence

jankattein.com

www.instagram.com/jankatteinarch

Nearby

Back to top of page